Delta Drain    Plaster Lath   Delta MS500    Delta Geo Drain Quattro    Delta PT    Delta FM    Delta MS20 Company Video
 

 

 

 

DELTA®-GEO-DRAIN Quattro

Installation instructions

■ 1. If the waterproof coating is 1.9 m high, apply the sheet horizontally straight from the roll. On higher walls, apply the sheet vertically from top to bottom. Use a carpet knife to cut the sheet to the requisite length across the roll.

■ 2. The micro-perforated slip film should face the waterproofing while the permanent-filtration geo-textile should face the soil. If the exact level of the ground surface is not known, attach the sheets approximately 10 cm above the upper edge of the waterproof layer. After backfilling, trim the sheets in parallel with the surface of the soil. At the bottom, sheets should end at the drainpipe, which should be surrounded on all sides with a layer of permanent-filtration material at least 15 cm thick.

■ 3. Once the ground level is known, sheets may be attached using DELTA®-GEO-DRAIN CLIPS arranged along a horizontal line, after which the DELTA®-NOPPENBAHNEN PROFIL may be latched on.

■ 4. Detach the micro-perforated slip film from the edge of the overlapping sheet and push it behind the smooth overlap of the sheet installed previously. Remove the strip that covers the adhesive tape and glue the two dimpled sheets together.

■ 5. Before attaching a sheet to a corner, crease it along the line of the edge. Place any plastic light wells directly on top of the sheet. Window openings can be cut out later. When light wells have already been installed, cut the sheet precisely along their lower edge and make one vertical cut in the middle.


Detailed installation instructions for DELTA®-GEO-DRAIN Quattro are available on the internet from www.doerken.de as PDF files for you to print out and save.

Protection and drainage system
For thick
waterproof
coatings
For vertical application in building construction